Periodic maintenance
The Maintenance module turns scheduled equipment checks into Maintenance reports. Each equipment item receives its own report in the queue, where a technician can take it or a manager can assign it.
Availability: owners, administrators and people with Manage assets. Maintenance, Assets and Reports must be enabled, with the corresponding subscription coverage. Level: Intermediate.
Create a plan
- An administrator enables Maintenance in Settings → Modules and features. It stays disabled until explicitly selected.
- Open Maintenance → Create plan and confirm the serviced company. Each plan belongs to your own work or one customer.
- Enter a name, instructions and urgency. With advanced routing, select a line from the route that applies to Maintenance; otherwise the general queue is used.
- Choose Fixed calendar or From completion, the interval, first date and lead time. Seven days of lead time are suggested.
- Add equipment. Create equipment here preserves the draft and selects the new item. Each item inherits the plan date; Customize sets another date and Reset restores inheritance.
- Save as Active to start or Draft to review it. Active plans require at least one item.
Dates and reports
The system checks schedules every five minutes in the serviced company’s time zone: the organization, symbolic company or linked account. The screen identifies this zone. Personal preferences change displayed times, not calendar due dates. The maintenance due date is independent of the technician’s service or arrival appointment.
With Fixed calendar, monthly maintenance anchored on the 31st uses the last day of shorter months and returns to the 31st when available. With From completion, the next interval starts when the report is actually resolved, including any confirmation required by the organization.
Only one execution can remain pending per equipment item and plan. Waiting, suspension, pending signature and delegation keep that execution pending. Further due dates do not create additional reports. Completing a fixed-calendar execution resumes at the next future date and records how many due dates were skipped because of delay.
Reports identify System as their creator, preserve their original instructions and use the queue’s existing notification preferences. Without an authenticated requester, they cannot request a remote requester signature; the other permitted completion options remain available.
When maintenance is delegated to a provider, it is completed after accepting the provider’s resolution and satisfying the required confirmation. With mandatory signatures, accepting the provider returns the report to the source team: an onsite signature or authorized exemption must be recorded from the report to complete maintenance.
Cancel, pause and correct
- Cancelling a report marks that item in the plan Needs review. A manager uses Reschedule to provide a new date. Other items continue normally.
- Reopening the latest execution stops generation again. If a later execution already exists, preserve the history and create a corrective report.
- Paused and Archived stop new generation and preserve issued reports. Archival is terminal for the plan; removing equipment retains its history.
- Resuming recovers at most one pending maintenance report per item, without generating a backlog of overdue reports.
- Edits affect future executions. The plan’s company is immutable: create a new plan for another context.
Shared equipment and blockers
Plans can include own equipment, customer equipment and equipment shared by a connected company within the selected context. Shared items require collaboration and an active grant. Scheduling maintenance does not authorize remote equipment changes: those actions still follow the existing authorization process.
Before generation, the system checks equipment, company, sharing, modules, coverage, type, urgency and service line. Deactivation, archival, a company change or revocation blocks the affected schedule with an explanation. History is retained and plans never move to another company automatically.
Review Last automatic check and blocking reasons in the details. If checks stop updating, an administrator should verify that the scheduler is running. Temporary generation failures are retried without duplicating reports.
This guide describes the features currently available to organization users.